A refinance that includes a renovation, or a loan on a building that will be torn down, can stall on asbestos even after a Phase I is in the file. The work-practice rule is different from the due-diligence report. 40 C.F.R. 61.145(a), opened November 4, 2026 on the eCFR, says that to determine which requirements apply, and before demolition or renovation begins, the owner or operator must thoroughly inspect the affected facility, or the part where the work will occur, for asbestos, including Category I and Category II nonfriable asbestos-containing material. The section then sets quantity thresholds of regulated asbestos-containing material that decide whether the notice and work-practice paragraphs apply in full, or whether a demolition with less material owes a narrower notice. This page does not copy those measurements. They change, and a pasted number would be the wrong document. The environmental professional and the current eCFR control. This note is general information. It is not legal advice, tax advice, or an appraisal. The professional named in the note decides how the rule applies to a given property.
A Phase I environmental site assessment is the lender's due-diligence report, described on Phase I assessments. It is not this notification. A property-condition report is property condition assessments. A park of older flex buildings where a buyer may renovate is Cotton Center.
Notice, and the idea of removing regulated material before it is disturbed
Subsection (b) says each owner or operator of a demolition or renovation to which the section applies shall provide the Administrator written notice of intention to demolish or renovate. Delivery by mail, commercial service, or hand is acceptable. The notice must be updated when necessary, including when the amount of asbestos affected changes by at least the percentage the subsection states. The subsection also sets how far ahead of the work the notice has to be postmarked or delivered, with a different clock for a demolition ordered because a building is structurally unsound and in imminent danger of collapse. Those clocks are in the regulation. They are not repeated here as a construction schedule.
Subsection (c) says that where it applies, regulated asbestos-containing material is removed before activity that would break up, dislodge, or disturb it, or that would block later removal, unless a listed exception applies. Exceptions include certain Category I material that is not friable and not in poor condition, material encased in concrete that is kept wet when exposed, and material that could not be reached for testing until demolition had already made safe removal impossible. Wetting is the work practice the section keeps returning to. A trained on-site representative is required for regulated activity. Training evidence is posted at the site. None of that is a scope of work from this office. A Tempe campus with older lab buildings is ASU Research Park. An office campus that may be renovated is Papago Park Center.
What a mortgage arranger does not certify
Capital Market Funds is not an environmental consultant, not the Administrator, and not the contractor. We can ask whether the inspection and the notice are in the file before a renovation loan is shown to a lender. We do not say a building is clear. Capital Market Funds is not a Fannie Mae DUS lender.
The office is 7373 E Doubletree Ranch Rd #255, Scottsdale, AZ 85258. The phone is (480) 495-8072. Capital Market Funds, LLC - CBK-2007014 - Commercial Mortgage Banker and NMLS 2691252.
Sources
Questions
- Is a Phase I the asbestos notice this rule describes?
No. Section 61.145 requires a thorough inspection of the area to be demolished or renovated, and a written notice when the section applies. A Phase I is a separate due-diligence report. A lender may want both. One does not close the other.
- Why doesn't this page print the square-foot threshold?
The eCFR section sets measured amounts of regulated material that change which paragraphs apply. Those amounts belong in the current regulation and in the consultant's report, not in a loan essay that would go stale if the rule is amended.
- Does a demolition with little or no asbestos still need a notice?
Subsection (a) says that when the combined amount is under the thresholds, or there is no asbestos, specified notification paragraphs still apply to a demolition. Read the current subsection rather than skipping notice because someone said the building was clean.
- Will Capital Market Funds hire the asbestos contractor?
No. The owner or operator and their environmental professional handle inspection, notice, and removal. We arrange financing. We are not the contractor.
- Phase I assessments
- Property condition assessments
- Cotton Center
- ASU Research Park
- Papago Park Center
- Arizona construction loans
Financing pages for this note
The loan and city pages closest to this subject. Capital Market Funds arranges the request from Scottsdale and is not the lender.
Talk to Craig about your deal. Call (480) 495-8072 · Contact